Case Study: Commercial Aeroseal Duct Sealing Milwaukee

commercial building in milwaukee that had aeroseal duct sealing.

When it comes to maintaining efficient office spaces, HVAC performance and indoor air quality are critical for tenant comfort and satisfaction. The office building at 140 S 1st Street in downtown Milwaukee recognized these needs and chose Aeroseal duct sealing as an effective solution.

Property Snapshot

  • Address: 140 S 1st St, Milwaukee, WI 53204

  • Building Type: Multi-tenant Office Space

  • Size: 28,779 SF (25,911 SF Rentable)

  • Investment Value: $3,995,000

  • Year Built: 2007

  • Stories: 3

  • Tenants Include: Towne Bank, Chiropractor, Prestige Collective, STIR Marketing, Complete Office/Wisconsin-EBI

Project Goals

The primary objectives were clear:

  • Improve HVAC efficiency

  • Enhance indoor air quality

  • Increase tenant comfort

The Aeroseal Solution

Our experienced team of five technicians utilized state-of-the-art Hypervac 220s equipment to complete this comprehensive duct sealing project over three days. The process involved:

  • Pre-sealing assessment and diagnostics

  • Application of Aeroseal technology throughout the building’s HVAC duct system

  • Post-sealing verification and testing

Overcoming Challenges

This project required strategic coordination to minimize disruption in a fully occupied, multi-tenant building. Careful planning ensured seamless access to ductwork across multiple floors without disturbing daily tenant activities.

Project Results

The effectiveness of Aeroseal duct sealing was immediately evident:

MetricBefore SealingAfter Sealing
Airflow Leakage30-40%< 5%
HVAC EfficiencyInefficientEnhanced
Energy UsageHighReduced
Indoor Air QualityPoorSignificantly Improved
Tenant ComfortUneven temperaturesIncreased satisfaction

What Our Clients Are Saying

  • Towne Bank: “We’ve noticed a significant improvement in airflow and temperature consistency. It has made our workspace much more comfortable.”

  • Chiropractor: “The improved air quality is evident. Our patients and staff immediately felt the difference.”

  • Prestige Collective: “Our office environment is noticeably better. The sealing was quick, professional, and effective.”

  • STIR Marketing: “Energy efficiency has clearly improved—our energy bills are reflecting noticeable savings.”

  • Complete Office/Wisconsin-EBI: “Tenant satisfaction has increased, and overall comfort throughout the space is much better.”

Highlights of the Project

  • Swift and efficient execution within a tight three-day schedule

  • Minimal tenant disruption despite the building being fully operational

  • Highly effective coordination among team members using specialized equipment

Conclusion & Recommendations

The Aeroseal duct sealing project at 140 S 1st Street demonstrates the value of proactively maintaining HVAC systems. The positive impact on energy efficiency, air quality, and tenant comfort makes Aeroseal duct sealing an ideal solution for similar office buildings aiming to enhance their operational standards.